installavhotel
Designing a Hotel Conference AV from Scratch
MP Sound Team · 02/06/2026
When a hotel comes to us for a conference-room AV rebuild, we follow a 7-step process. This post walks through the discovery brief, the technical drawings, the install schedule and the staff training we leave behind. With photos from the latest Paphos project.
